Requirements:
- Space-saving storage of an extensive range of small and medium-sized parts with fast picking times
- Existing high-bay shelf storage space to be used solely for large parts in future
- Parts picked precisely and on time
- Option to increase storage capacity flexibly and at short notice
- Free up more room for production
Solution:
- Highly dense storage in shuttles: 1,185 m² of storage space on a 68 m² footprint
- Besides small parts, components weighing up to 15 kg are also stored
- Load placed on existing high-bay shelf storage system eased by 30 percent
- 35 percent of the former storage space has been freed up for production as a result of the space saved
- Picking orders issued via ERP system
- Picking supported by LED pointers, cutting retrieval times by around 30 percent
Scope of delivery:
- 8 Shuttle XP systems including LED pointers for pick-by-view
- Java MIF link