Requirements:
- Fast, reliable relocation of the storage systems
- Units dismantled in confined conditions
- Downtimes kept to a minimum
- Simultaneous maintenance of the units
Solution:
- Seven vertical carousels moved smoothly between locations
- Downtime for the electronics production operation kept to a minimum
- No delay in production deliveries thanks to careful relocation planning
- Money saved by servicing the units, replacing spare parts, and performing an electrical safety test in the course of the move
Scope of delivery:
- Relocation project planning and advice provided by Kardex Remstar’s Life Cycle Services
- Seven Megamat vertical carousels dismantled (height: 5 m, width: 4 m)
- Units transported from Bonn to Ennepetal 100 kilometers away
- Storage systems reassembled and serviced, spare parts replaced, and electrical safety test performed